Scaffolding Double Coupler
Specification
Weight 1.1kg Tube Diameter 48.3mm Thickness 5mm
Material Malleable Surface Treatment Galvanized
Type British Style Color Red Standard EN74
Packing Details
Package 25pcs packed in each pp bag,40 bags packed in woven bags
Carton Size Inner Package Size Port Tianjin
Supply Ability
Daily 3,000pcs Monthly 100,000pcs Annual 2,000,000pcs
Payment Term Delivery Date
30% T/T Deposit + 70% T/T 15-25 days
Application
Widely used in setting up Scaffolding for the Construction Industry
Structure and Usage
Malleable Iron Cross Coupler
Connected to the intermediate coupling parts of the rail and sleeper
Providing Enough Flexibility for the Sleeper
On concrete sleeper track, for concrete sleepers are less flexible, the role is to rail fixed in the sleeper to maintain gauge and stop rail which moves relative to the sleeper aspect to mobile
Sufficient Strength and Durability
Effectively maintain reliable links between rail and sleeper
Multifunction and Multipurpose
The fastening system also requires fewer parts, simple installation, easily remove when the fasteners are used in the construction to build a temporary shed for steel scaffolding and steel structure, mast, and template support for fastening connection with the small size, installed demolition, transportation convenience, the provincial materials characteristics
Contact Information
Ms. Lina Liu
MSN: liulina900@live.com
SKYPE: liulina900
Telephone: 0086-1084471730
Weight 1.1kg Tube Diameter 48.3mm Thickness 5mm
Material Malleable Surface Treatment Galvanized
Type British Style Color Red Standard EN74
Packing Details
Package 25pcs packed in each pp bag,40 bags packed in woven bags
Carton Size Inner Package Size Port Tianjin
Supply Ability
Daily 3,000pcs Monthly 100,000pcs Annual 2,000,000pcs
Payment Term Delivery Date
30% T/T Deposit + 70% T/T 15-25 days
Application
Widely used in setting up Scaffolding for the Construction Industry
Structure and Usage
Malleable Iron Cross Coupler
Connected to the intermediate coupling parts of the rail and sleeper
Providing Enough Flexibility for the Sleeper
On concrete sleeper track, for concrete sleepers are less flexible, the role is to rail fixed in the sleeper to maintain gauge and stop rail which moves relative to the sleeper aspect to mobile
Sufficient Strength and Durability
Effectively maintain reliable links between rail and sleeper
Multifunction and Multipurpose
The fastening system also requires fewer parts, simple installation, easily remove when the fasteners are used in the construction to build a temporary shed for steel scaffolding and steel structure, mast, and template support for fastening connection with the small size, installed demolition, transportation convenience, the provincial materials characteristics
Contact Information
Ms. Lina Liu
MSN: liulina900@live.com
SKYPE: liulina900
Telephone: 0086-1084471730
Certificate
- ISO/CE
Main Products
Coupler,Scaffolding,Scaffolding Coupler,Safety Products