Red column Equipment
This series of equipment were made of high quality welded tube steel, The charge diameter to 140mm, Wall thickness to more 2.75-3.0mm. Moving parts are connected by high-quality bearings,.Shaft crafted from the steel car. In addition to welding parts, the other connecting parts are galvanized screw connections,covering the surface with a security buckle, no specialized tools can not remove. The appearance of equipment are electrostatic sprayed by imported polyester powder.Thickness is more 60 microns,The degree of color can maintain 4-6 years, color to red, yellow-based.The installation of this series use embedded method. Dig a 50 * 50 * 50cm square hole at first. Embedded parts of the equipment placed on the pit after a good direction. Then the ratio of 1:2:3 concrete pit is filled. Concrete surface should parallel to the ground. embedded parts screws exposed concrete surfaces 3-4cm. After re-adjusting the direction of embedded parts. install the equipment until concrete cures, Straightening and securely installed after the cover. Equipment installation is complete. (This series of equipment, stability, maintenance and replacement are convenience)
Blue column
This series of equipment and red post equipment are basically the same texture, The charge diameter is 114mm. Wall thickness to more 2.5-2.75mm. Spray thickness is more 60 microns, The color is to blue, yellow-based. When installing this series. Use (direct burial method)according to embedded dimensions, dug one or more of 40 * 40 * 40cm square hole,put the equipment into the pit directly. After adjusting the direction and height. Directly with the proportion of 1:2:3 concrete fill irrigation. When filling of concrete.,check the equipment direction, altitude and if it is vertical or not. After filling of concrete, the equipment can not move. Until the concrete to dry before use (This series of equipment installed is not convenient for the location shift and is not conducive to the maintenance, replacement)
Frame Equipment
This series of equipment is the same texture with the blue column. Its advantages are: Equipment on the ground smooth, easy to install。Fix the expansion bolt according to installation eyes. Debugging, can be used after tightening (This series of equipment for installation of concrete floor, Other equipment installed at the eye surface, placement of concrete block to install the embedded)
This series of equipment were made of high quality welded tube steel, The charge diameter to 140mm, Wall thickness to more 2.75-3.0mm. Moving parts are connected by high-quality bearings,.Shaft crafted from the steel car. In addition to welding parts, the other connecting parts are galvanized screw connections,covering the surface with a security buckle, no specialized tools can not remove. The appearance of equipment are electrostatic sprayed by imported polyester powder.Thickness is more 60 microns,The degree of color can maintain 4-6 years, color to red, yellow-based.The installation of this series use embedded method. Dig a 50 * 50 * 50cm square hole at first. Embedded parts of the equipment placed on the pit after a good direction. Then the ratio of 1:2:3 concrete pit is filled. Concrete surface should parallel to the ground. embedded parts screws exposed concrete surfaces 3-4cm. After re-adjusting the direction of embedded parts. install the equipment until concrete cures, Straightening and securely installed after the cover. Equipment installation is complete. (This series of equipment, stability, maintenance and replacement are convenience)
Blue column
This series of equipment and red post equipment are basically the same texture, The charge diameter is 114mm. Wall thickness to more 2.5-2.75mm. Spray thickness is more 60 microns, The color is to blue, yellow-based. When installing this series. Use (direct burial method)according to embedded dimensions, dug one or more of 40 * 40 * 40cm square hole,put the equipment into the pit directly. After adjusting the direction and height. Directly with the proportion of 1:2:3 concrete fill irrigation. When filling of concrete.,check the equipment direction, altitude and if it is vertical or not. After filling of concrete, the equipment can not move. Until the concrete to dry before use (This series of equipment installed is not convenient for the location shift and is not conducive to the maintenance, replacement)
Frame Equipment
This series of equipment is the same texture with the blue column. Its advantages are: Equipment on the ground smooth, easy to install。Fix the expansion bolt according to installation eyes. Debugging, can be used after tightening (This series of equipment for installation of concrete floor, Other equipment installed at the eye surface, placement of concrete block to install the embedded)
Main Products
Outdoor fitness equipment,Park Chair,Chilren Slides