1. Main Functions of Ultrasonic Detector
1). UD(ultrasonic detector) as one of the main part of parking lot system, makes use of ultrasonic detecting the parking space to get message and transfer to ZCU or other equipments by RS485.
2). One parking space needs one UD which is installed in the middle of the car park space.
2.How parking Guidance System Works:
Firstly, UD takes use of ultrasonic wave to detect the car space to see if it is occupied by vehicles and transfer relative command to LED Indicator which will turn from green to RED when occupied, or it will keep GREEN; meanwhile, the UD transmit its status message to ZCU immediately, and ZCU will collect and forward the information to CCU; CCU processes these data and sends the relevant command to ZCU and LED panel.
3. Physical Parameter
Operating Voltage:DC 12~24V Size: 100*23(mm)
Operating Current: 10mA(no indicator), 28mA( with indicator) Weight:113g
Operating Temperature:-20~+80°C Communication: RS-485
Detecting Distance: 0.1~3.5m Communication distance: ≤1000m
Detecting Area (3.5m):0.4 sq.m Serial port Setting:4800bps,N,8,1
Max Error: 0.1m
4.Cases:
1. April,2009 105 bays Spain OviedoBus station
2. May,2009 330 bays Chengdu CNPC South China branch
3.May, 2009 109 bays Beijing Ocean family
4.June,2009 650 bays France Alizes
5.July, 2009 890 bays Kunming THE TWIN TOWERS
6. July,2009 1700 bays Philippines SM megamall
7. Aug, 2009 1160 bays Poland Krakow airport
8. Aug, 2009 170 bays Slovakia CASSOVAR
9. Aug, 2009 158 bays Iran Shiraz shopping mall
10. Sep,2009 50 bays Norway subsea7 office building
....
5.CE certification
1). UD(ultrasonic detector) as one of the main part of parking lot system, makes use of ultrasonic detecting the parking space to get message and transfer to ZCU or other equipments by RS485.
2). One parking space needs one UD which is installed in the middle of the car park space.
2.How parking Guidance System Works:
Firstly, UD takes use of ultrasonic wave to detect the car space to see if it is occupied by vehicles and transfer relative command to LED Indicator which will turn from green to RED when occupied, or it will keep GREEN; meanwhile, the UD transmit its status message to ZCU immediately, and ZCU will collect and forward the information to CCU; CCU processes these data and sends the relevant command to ZCU and LED panel.
3. Physical Parameter
Operating Voltage:DC 12~24V Size: 100*23(mm)
Operating Current: 10mA(no indicator), 28mA( with indicator) Weight:113g
Operating Temperature:-20~+80°C Communication: RS-485
Detecting Distance: 0.1~3.5m Communication distance: ≤1000m
Detecting Area (3.5m):0.4 sq.m Serial port Setting:4800bps,N,8,1
Max Error: 0.1m
4.Cases:
1. April,2009 105 bays Spain OviedoBus station
2. May,2009 330 bays Chengdu CNPC South China branch
3.May, 2009 109 bays Beijing Ocean family
4.June,2009 650 bays France Alizes
5.July, 2009 890 bays Kunming THE TWIN TOWERS
6. July,2009 1700 bays Philippines SM megamall
7. Aug, 2009 1160 bays Poland Krakow airport
8. Aug, 2009 170 bays Slovakia CASSOVAR
9. Aug, 2009 158 bays Iran Shiraz shopping mall
10. Sep,2009 50 bays Norway subsea7 office building
....
5.CE certification
Certificate
- CE
Main Products
parking equipment