Working Scope
Design, Supplying complete set of STG island;
Supervision for installation and commissioning.
Key Parameters
Outlet of superheater:2200t/h
Outlet of reheater: 1844.38t/h
Inlet of economizer: 2068t/h
1st stage water spray of the superheater: 66t/h
2nd stage water spray of the superheater: 66t/h
Pressure at the outlet of superheater: 25.4Mpa
Design, Supplying complete set of STG island;
Supervision for installation and commissioning.
Key Parameters
Outlet of superheater:2200t/h
Outlet of reheater: 1844.38t/h
Inlet of economizer: 2068t/h
1st stage water spray of the superheater: 66t/h
2nd stage water spray of the superheater: 66t/h
Pressure at the outlet of superheater: 25.4Mpa
Certificate
- ISO9001 ASME/GB/EN/BS
Main Products
power plant, boiler, steam turbine, generator, CCPP, EPC contractor